Case Study: Oracle Remove Asbestos-Containing Heaters From School Refurbishment Project

How Oracle meet a tight deadline to removal asbestos-containing heaters from a school.
Case Study: Oracle Remove Asbestos Containing Heaters From School 1

The site:

A secondary education site

The challenge:

Oracle was approached by the heating contractor to remove asbestos-containing heaters that were found during a recent asbestos refurbishment survey. Time was of the essence as the school needed the works completing during the school break.  

What did we do:

Oracle’s team of asbestos specialists were onsite within 48hrs and removed the heaters over the course of a weekend. 

The result:

This was an excellent result for the client! Oracle managed to squeeze the removal works into what was already a tight schedule. This meant that the main contractor was able to keep within their scheduled programme of works. As a result, the heating was fully operational in time for the return of the children after their school holiday break.