Case Study: Shoe Manufacturing Plant in Northampton
Case Study: Its nearly Christmas and in January we have £5 million investment in new machinery...
Case Study: Its nearly Christmas and in January we have £5 million investment in new machinery...
The site: A secondary education site The challenge: King Edward VI College in Stourbridge was in the process of having some refurbishment works carried out. During this process, asbestos bitumen was found, which had the potential to delay the works. It was vitally...
The site: A secondary education site The challenge: Oracle was approached by the heating contractor to remove asbestos-containing heaters that were found during a recent asbestos refurbishment survey. Time was of the essence as the school needed the works completing...
The Site: A primary school in Leicestershire was evacuated due to flooding. The challenge: Weeks before Christmas, major rainfall caused a flood through the foundation stage classrooms of Ashby Willesley primary school. This forced the children and staff out of the...
The site: 7 High Street Shops in Egham, Surrey The challenge: Oracle was called upon to remove asbestos material that was found during the demolition of seven town centre shops in Egham, Surrey. As the works were being carried out to a town centre location, it was...
The site: A secondary school located in Solihull, West Midlands. The challenge: As the cold weather approaches, a secondary school in Solihull, West Midlands were in desperate need of a boiler replacement. As with any school holiday project, especially during a...
The Site: A domestic property in Kettering. The challenge: Mrs Thompson was having renovation works carried out on her house in Kettering. In the asbestos survey, there were some presumed materials to the gas fire. Mrs Thompson was concerned that this would hold up...